Gedeon GRC Consulting was selected as a Prime consultant for the survey, mapping, and preliminary and final design for the stormwater remediation improvements for County Road 80 in the Town of Southampton, NY.
The main goal of this project was to remediate the quantity and quality of highway stormwaterrunoff originating from CR80, Montauk Highway from the vicinity of MaidstoneLane to the vicinity of Hillover Road.
New Drainage System: The installation of a new drainage system was required to remedy this situation. A new positive drainage system was designed for installation along the length of CR80, Montauk Highway; a hydrologic survey and analysis of the watershed was completed to determine whether additional portions of the roadway required drainage systems and whether the existing drainage system was still needed.
Roadway improvements & Additional Work Components: For roadway resurfacing within the drainage system limits, design for full-depth pavement repair, curb, sidewalk, utilities, and other roadway infrastructure improvements were provided for certain roadway portions.
Other tasks included construction cost estimates and plans, presentation, contract documents, permits, specifications, and agency coordination.